LCA Calculator

Full lifecycle assessment using Puro Standard equations

Life Cycle Assessment Calculator

For: Carbon Sink CS-2026-12

Puro Standard Equation:

Net CO2e = Cstored - Cbaseline - Closs - Eproject - Eleakage

1
CARBON STORED (Cstored)
+10.38 t CO2e

Input Parameters:

Biochar Dry Mass:7,620 kg

(Sum of all batches, impurity-adjusted)

Organic Carbon (Corg):75.4% (avg)
H/Corg Ratio:0.52 (avg)

Persistence Modeling:

H/Corg < 0.70: Qualifies for CORC200+
Persistence Factor:0.95 (conservative)
Durability:Several centuries

Calculation:

Cstored = (7,620 kg × 0.754) × (44/12) × 0.95 = 10.38 t CO2e

2
BASELINE REMOVAL (Cbaseline)
-0.00 t CO2e
Baseline Scenario:New Facility

Counterfactual Analysis:

  • No biochar production before project
  • Biomass would have been left to decay
  • No carbon sequestration in baseline
3
CARBON LOSSES (Closs)
-0.21 t CO2e
Loss SourceAmountCalculation
Production Handling

Dust during loading/unloading

0.08 t1% of Cstored
Transport

Wind losses, spillage

0.05 t0.5% of Cstored
Application

Dust during spreading

0.08 t0.8% of Cstored
Total Closs0.21 t CO2e (2% of total)
4
PROJECT EMISSIONS (Eproject)
-0.95 t CO2e
Scope 1 (Direct):0.45 t CO2e
Scope 2 (Electricity):0.32 t CO2e
Scope 3 (Transport):0.18 t CO2e
5
LEAKAGE (Eleakage)
-0.15 t CO2e

Market Leakage Assessment:

  • Biomass sourcing: Local agricultural residues
  • No displacement of other uses
  • No feedstock diversion

Activity Shifting:

  • No land use change
  • No alternative biochar displaced

Conservative Estimate:

Eleakage = 0.15 t CO2e (1.5% of Cstored)

NET CO2e REMOVAL CALCULATION
Cstored+10.38 t CO2e
Cbaseline-0.00 t CO2e
Closs-0.21 t CO2e
Eproject-0.95 t CO2e
Eleakage-0.15 t CO2e
NET REMOVAL9.07 t CO2e

Removal Efficiency

87.4%

(Net Removal / Cstored)

High Quality Removal
Uncertainty Analysis
ParameterBest EstimateRangeUncertainty
Cstored10.38t9.86-10.9t±5%
Eproject0.95t0.86-1.05t±10%
Closs0.21t0.18-0.24t±15%
Eleakage0.15t0.12-0.18t±20%
Net Removal Range:8.52 - 9.62 t CO2e
Confidence Level:95%