Reactor Configuration
Manage reactor settings, parameters, and calibration
Last Updated: 2025-12-01 by Amit Patel
Basic Specifications
Facility Type
Stationary
Location
North Bengal, West Bengal
GPS Coordinates
26.7271°N, 88.3953°E
Max CO2e Removal
3,000-10,000 t/year
Reactor Details
Reactor Mode
Continuous
Process Type
Pyrolysis
Heating Method
[Direct/Indirect - TBD]
Biochar Streams
[Single/Multi - TBD]
Reactor Capacity
500 kg/batch
Residence Time
45-60 minutes
Co-Product Management
Syngas Fate
Combustion w/ energy recovery
Bio-oil Fate
Combustion
Combustion System
Afterburner
Combustion Target
850°C minimum
Instrumentation & Sensors
TC-001: Carbonization Temp Sensor
Type K Thermocouple
Last Calibrated
2026-01-05
TC-002: Combustion Temp Sensor
Type K Thermocouple
Last Calibrated
2026-01-05
FGA-001: CEMS (Continuous Emissions)
Flue Gas Analyzer
Last Calibrated
2026-01-03
WS-001: Weight Scales
50t capacity
Last Calibrated
2025-12-20
Safety Systems
CO Detectors
6 units (CD-001 to CD-006)
Emergency Flare
FL-001 (Auto-activated)
Pressure Relief Valves
PRV-001, PRV-002
Important
Report any configuration changes to Puro.earth within 30 days
TC-001: Carbonization Temp Sensor
Due: 2026-07-01
TC-002: Combustion Temp Sensor
Due: 2026-07-01
FGA-001: CEMS (Flue Gas Analyzer)
Due: 2026-04-10
WS-001: Weight Scales (50t)
Due: 2026-06-20
CD-003: CO Detector (Storage)
Due: 2026-01-01